Client: KGJ Price
Project: Camden Junction Points Heating
Overview of Deliverables:
Strip out of existing points heating to enable replacement of the points. Design and installation of new points heating (2no. point ends). Points heating was installed onto points off site and then terminated and commissioned following the installation of the points.
Value: £60k
Duration 6 months